New Nickel Plant at the Rönnskär Smelter

Boliden invests SEK 48 million in an evaporator for nickel sulphate at the Rönnskär copper smelter in Skellefteå. The production facility will double the smelter's nickel sulphate production capacity and enhance its flexibility in terms of processing raw materials containing nickel.

 Nickel is an important by-product for Rönnskär, which produces approximately 2,000 tonnes of nickel sulphate per year. Nickel is found in copper concentrate as well as in secondary materials recycled at the smelter. Nickel sulphate has been produced since the fifties and is used as a raw material in the production of nickel, as well as in the chemical industry.  
  
 The new nickel facility will be part of the existing copper sulphate plant. The plant purifies a solution of chemicals from the electrolytic refinery to produce copper sulphate and nickel sulphate. Once the new plant is up and running in the autumn of 2006, nickel production capacity will double. The highly modern self-contained process also means that nickel emissions from Rönnskär will be halved.  
  
 The Rönnskär smelter produces metals and chemicals from mining raw materials and recycled material. Its main products are copper, lead, gold, silver and zinc clinker. Rönnskär is currently one of the world's largest facilities for recycling base metals.    
  
 For further information, please contact:  
 Roger Sundqvist, General Manager, Rönnskär, tel.: +46 (0)910-77 34 00, +46 (0)70-399 72 91  
 Ulf Söderström, Senior Vice President, Group Communications, Boliden AB,  
 tel.: +46 (0)8-610 15 57, +46 (0)70-618 95 95

Boliden is one of the world's leading mining and smelting companies with operating facilities in Sweden, Finland, Norway and Ireland. Boliden mainly produces copper, zinc and lead, as well as gold and silver. Other important operations include mineral exploration and metal recycling. The company has around 4,500 employees and net sales of almost SEK 18 billion. Its shares are listed on Stockholmsbörsen's O-list and on the Toronto Stock Exchange in Canada.
www.boliden.com

More press releases & news

The abnormally high seismic activity in Garpenberg has decreased and mining production at low levels will commence in the second quarter. The first quarter throughput was just under 0.8 Mton instead of the expected slightly over 0.9 Mton at already communicated grades. All inspections are not yet complete but production in the most affected part of the mine is not expected to resume in 2026. Until further notice, Garpenberg's production is therefore estimated to be around 30 percent of the guided capacity of 3.7 Mton per year. For the first quarter of 2026, EBITDA will be negatively affected by approximately SEK -400 million at today's prices and terms.

The shareholders of Boliden AB (p

Boliden has decided to invest in a new hoist system at Garpenberg and an industrial demonstration plant for the production of supplementary cementitious material at Rönnskär. The investments, which amount to SEK 4 billion and SEK 1.5 billion respectively, will strengthen the earnings capacity of both units and lay the foundation for exploiting further future opportunities.